Stage 2 – Villa Cascada – La Zagaleta

In this second episode following the construction of a luxury villa in La Zagaleta we visit the site during the pouring of reinforced concrete to create the concrete slab of the basement level. As part of the process, samples of the concrete are taken from each lorry mix, approx 45 lorries in total throughout the course of the day, which are sent to the laboratory of https://www.cemosa.es/, a structural engineering firm and tested over several time intervals for resistance and hardness. In this episode we once again meet Chris Warren from Renson Management who explains the process.