Stage 13: Getting closer to completion

Lots of progress has been made at Villa Mozart during the summer months. Outside, much of the landscaping work in the garden already done, although the lawns are still to be laid. Inside, a dramatic gloss black designer kitchen has been fitted, walls papered, bathrooms fully tiled and finished, and the glass balustrades installed. On the roof terrace, the pool and jacuzzi are now almost ready to be filled, offering some amazing views of the Mediterranean from the comfort of your own heated pool.