Stage 12: Progress continues apace

Outside, the pool in the garden is now lined and has been partially filled and the driveway paving is being laid stone by stone. Indoors, the electric wiring is now completed, with switches, power points and climate control systems still to be installed. In the master bedroom, the feature fireplace wall has been clad in marble on both sides and the master bathroom is being fitted out.