Stage 5: Completion of the first floor

Building work continues to advance at a fast pace, with the concrete slab covering the first floor now in place and the brickwork built above now revealing the definitive shape and size of the house. The panels in the ceiling of the master bedroom terrace that will offer views into the rooftop swimming pool can now be seen clearly.

DSC_0178

DSC_0179

DSC_0180

DSC_0182

DSC_0185