Stage 7: Plastering the façade and the interior

Scaffolding has now been erected around the exterior of Villa Mozart, to begin plastering the façade, although this has already begun on the inside, as you can see from the hallway. Wiring and ducting for the climate control system has been installed on all floors. The views from the first floor terrace, both of La Concha and the Mediterranean, are stunning.