Stage 3: Building the ground floor

With construction of the basement level completed, the reinforced ground floor slab is poured and columns erected to support the first floor. At the same time, all of the basement retaining walls are waterproofed and drainage pipework to the basement is put into place. The sign advertising the villa for the sale also goes up on the property.

IMG_7697

IMG_7698

IMG_7700

IMG_7701

IMG_7814

IMG_7828