Stage 2: Building the basement

With excavations complete, lean-mix concrete is poured first, in preparation for reinforcement to the basement foundation slab. Once the formwork and the basement drainage are in place, the basement slab is ready for the concrete to be poured. As soon as this has been completed, the basement walls begin to rise.

IMG_6981

IMG_7193

IMG_7195

IMG_7197

IMG_7471

IMG_7477

IMG_7479