While the exterior is still being painted, work has advanced inside Villa Mozart, with the interior walls now mostly plastered and ready to be finished, the custom-built staircase installed in the entrance hall, and the feature fireplace in the master bedroom nearing completion. Marble tiling has been fitted to the bathroom walls, prior to the fitment of the shower and other fixtures.

04-26_4827

04-26_4830

04-26_4831

04-26_4835

04-26_4840

04-26_4841

04-26_4843

04-26_4850

contact Terra Meridiana
Stage 10: Work continues on the interior and exterior
Adam

"Let us know how we can help you and we'll be in touch as soon as possible"